Projects // Installation Management
The department of operation and maintenance of "KARKANIAS ENVIRONMENTAL TECHNOLOGY S.A." has undertaken several projects all around Greece.
- Larissa Industrial Zone WWTP
- WWTP of Municipality of Dion - Olympos
- Thessaloniki WWTP - Sindos (2002-2007).
- WWTP and pumping stations of Tourist Areas of Thessaloniki- Mihaniona (2003-2012)
- WWTP of Fiorina (2001 -2005)
- WWTP of Municipality of Almiros (2003 - 2008)
- WWTP of Municipality of Soufli (2006-2008)
- WWTP of Municipalities of Polikastro - Axioupoli (2002-2005)
- WWTP of Limni - Evia (1991-1996)
- Industrial waste or urban waste facilities, which have been designed and constructed by the company, operated and maintained for a reasonable period of time (from two to twelve months on the account of the employer)
Larissa Industrial Zone WWTP
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
WWTP of Municipality of Dion - Olympos
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() |