Projects // Solid Waste
Contracts for Design & Construction, Operation & Maintenance have been undertaken for the following projects:

- Construction of the second cell of the Sanitary landfill of Larissa: encompass the construction of the second cell, management of the produced biogas of the first cell and the construction of the tire cutting facility. (2002)
- Sanitary landfill of Eastern Aigialia which comprised the construction of the cell and the treatment of the produced drainages by a two stage biological treatment system. (2006)
- Caping of the first cell of Sanitary landfill of Larissa which comprised the complete cap and "sealing" of the first cell. (2006)
- Sanitary landfill of the Solid Waste Disposal Association of Kos island: encompass the construction of the ceil and the infrastructure works as well as the management of the produced biogas and treatment of drainages. (2007)
- Reclamation of Old Dump of the Municipality of Larissa (KIOSK!) which comprised the sealing and the complete cap of the old city dump. (2007)
Sanitary landfill of the Solid Waste Disposal Association of Kos island
![]() | ![]() | ![]() |
Construction of the second cell of the Sanitary landfill of Larissa
![]() | ![]() |
Sanitary landfill of Kilkis
![]() |